XAU₮ (Tether Gold)
XAU₮ is Tether Gold — a token backed by physical gold. Inside Enta it behaves like any other asset you hold: you can deposit into it, withdraw from it, and swap it for something else. You’ll find it under the XAU₮ tab on your Wallets page.1. The XAU₮ tab
Selecting XAU₮ shows a single row — Tether Gold — with an EVM badge on the left, your total XAU₮ balance, and its approximate value beneath in whichever currency you’ve chosen under View balances in. The eye icon next to the balance hides it, in case you’re on a shared screen.
Unlike USD₮, Tether Gold lives only on EVM networks. There’s no Solana or Tron version to choose between, so this tab only ever has one row.
2. Expanding your networks
The chevron on the right of the row expands it into the individual EVM networks XAU₮ is available on:
Each one shows its own XAU₮ balance, the approximate value beneath it, the wallet address it uses with a copy icon, and a chevron to open it.
