USD₮ (Tether)
USD₮ is Tether’s dollar stablecoin — one USD₮ is intended to be worth one US dollar. It’s the asset most money moves through in Enta, and it’s the first tab on your Wallets page. The same USD₮ exists on many different blockchains. Enta groups them into three wallets, because the network your money sits on decides what it costs to move and who can send to you.1. The three wallets
Each row shows its balance and its address, with a chevron on the right to open it.
These are three separate balances, not one balance shown three ways. Money on Solana can’t be sent from your Tron address, and vice versa. Moving between them is a Swap, which Enta can do for you — see Wallet to Wallet (Swap).
2. Inside the EVM wallet
EVM wallet is the only row that holds more than one network. It shows a single combined balance, and the chevron expands it into the individual chains:
Every row shows that network’s balance, its wallet address with a copy icon, and a chevron to open it.

3. Choosing a network to receive on
When someone asks which network to send USD₮ on, the answer depends on what their wallet or exchange supports:- Tron is the most widely offered, and is what most exchanges default to
- Solana is fast and cheap, and increasingly common
- On EVM, pick any of the free networks you both support — Arbitrum, Base, Celo, Optimism, Plasma or Polygon