Skip to main content

USD₮ EVM Wallet

Tapping any network inside the EVM wallet row on the USD₮ tab opens that wallet on its own page. Everything you can do with that specific balance happens here.
The example below uses Arbitrum, but Base, Celo, Ethereum, Optimism, Plasma and Polygon all work identically. Only the network name and the fee change — and on Ethereum, gas fees apply.

1. The wallet header

A breadcrumb at the top reads Wallets / Arbitrum, and tapping Wallets takes you back. Beneath it sits Arbitrum wallet balance for this network alone, with an eye icon to hide the figure and a refresh icon to update it. Three actions sit on the right: Deposit, Withdraw and Swap. The Arbitrum USD₮ wallet

2. Wallet details

The Wallet details panel holds everything someone needs in order to send you USD₮ on this network: View On-Chain opens the address in a public block explorer, so you can confirm a payment independently of Enta.
The panel carries a caution: only send USDT on the Arbitrum network to this address. Other tokens or networks may result in permanent loss.The address is specific to both the asset and the chain. Sending the right token over the wrong network is the single most common way funds go missing, and it usually can’t be undone.
Because all seven EVM networks share the same address, the address here looks identical to the one on the Base, Celo, Ethereum, Optimism, Plasma and Polygon pages. What matters is that the sender picks the same network you opened this page from.

3. Deposit

Deposit opens a short menu headed “Deposit To Arbitrum To…” with two ways to fund this wallet: The Deposit menu on an EVM wallet The bank route is the same flow documented in Bank Account (Onramp).

4. Withdraw

Withdraw opens a matching menu headed “Withdraw From Arbitrum To…”: The Withdraw menu on an EVM wallet Both routes are documented in full under Move Money — see External Address (Withdrawal) and Bank Account (Offramp).

5. Swap

Swap converts this balance into another asset, or moves it to another network, without leaving Enta. This is also how you move USD₮ between EVM, Solana and Tron. The full walkthrough is in Wallet to Wallet (Swap).

6. Recent transactions

Recent transactions at the bottom lists activity for this network only, with View All opening your complete history. On a wallet you haven’t used yet you’ll see “Oops!! No transactions here” — that’s just an empty state, not a problem. Tap any row to expand it for the full detail, including the transaction hash and receipt. See Transactions for the complete record across every network.